Pipelines

Important: Access Project Manager by first selecting the waffle menu's New experience preview option. For Classic Manager instructions, refer to the legacy documentation site.

Pipeline assets belong to projects. From Project Manager, you can view pipelines by selecting a project or a shared folder. The Pipelines tab of the assets table lists pipelines for the selected project. From the list, you can:

  • Click a pipeline to open it in Designer.
  • To delete the pipeline:
    1. Select the checkbox of the pipeline.
    2. Click the Delete icon.
    3. Click Delete to confirm.
  • Run pipelines by selecting them, and clicking Run selected pipelines in the toolbar.
  • Hover over the pipeline name and click the arrow to open the context menu, which provides the following options:
    • View. Open the pipeline in Designer.
    • Snap Statistics. See the Snaps used in that pipeline.
    • Activity Log. View the changes made to the pipeline.